A 2000kVA dry-type transformer releases substantial heat into the room. For overseas EPC projects, ventilation must be calculated from transformer losses, ambient temperature, altitude, enclosure design and allowed room temperature rise.
This guide is written for overseas buyers, EPC contractors, consultants and local utility reviewers. It uses IEC 60076-11, IEC 61936-1, mechanical ventilation design practice and local building requirements as the main technical language, with the final acceptance route defined by the project specification and local approval process.
1. Buyer Decision Points
| Decision point | What to check before RFQ |
|---|---|
| Loss budget | No-load and load losses define heat to remove |
| Air path | Low inlet and high outlet improve heat removal |
| Fan logic | AF cooling and room fans need alarm and failure handling |
| Room layout | Clearance and cable trays must not block airflow |
| Temperature monitoring | Alarm and trip contacts protect the transformer |
2. RFQ Data to Provide
- Guaranteed losses and temperature rise limit.
- Room ambient temperature and altitude.
- Transformer enclosure IP rating and fan option.
- Room dimensions, inlet/outlet location and ducting limits.
- Temperature relay output and BMS/SCADA interface.
- Required ventilation calculation or EPC review format.
3. Supplier Documents to Request
- Loss data sheet.
- General arrangement drawing.
- Temperature relay and fan wiring diagram.
- Ventilation assumption note.
- Installation and maintenance manual.
- Routine test and partial discharge test data.
4. Engineering Review Checklist
| Review item | Why it matters |
|---|---|
| Airflow | Insufficient airflow causes overheating |
| Fan failure | Needs alarm where forced ventilation is relied on |
| Enclosure | High IP rating can reduce cooling |
| Dust control | Dirty filters reduce airflow |
| Room heat load | Other equipment may add heat |
5. Reference Standards and Local Approval
Use IEC 60076-11 for dry-type transformer requirements and IEC 61936-1 for high-voltage installation guidance. Final room ventilation should be reviewed by the EPC mechanical or electrical designer.
Buyer Recommendation
Request loss data and ventilation assumptions before room construction. For 2000kVA dry-type units, late airflow corrections are more expensive than early design review.
Download This Guide as PDF
Save this technical guide for offline reference. Includes all tables, specifications, and contact information.
Related Articles
35kV / 36kV Substation Transformer Selection Guide for Export EPC Projects
A practical export-focused guide for selecting 35kV or 36kV substation transformers: voltage ratio, oil or dry-type selection, capacitor banks, utility interface, FAT documents and RFQ data for EPC and overseas industrial projects.
50Hz/60Hz Transformer Compatibility Guide: Flux, Saturation Risk, Derating Rules, and Dual-Frequency Design
A transformer designed for 50 Hz and a transformer designed for 60 Hz are physically different machines. The difference is not in the nameplate — both might say "2000 kVA, 11/0.4 kV, Dyn11" — but in the iron core: the cross-sectional area,