Testing support covers routine inspections, FAT coordination, IEC-referenced documentation and project-specific checks for transformers, switchgear, compact substations and related power distribution equipment.

Electrical equipment testing center for transformer and switchgear inspection
Testing and inspection area for transformer, switchgear and substation export orders.

Routine

Factory routine checks before shipment

FAT

Factory Acceptance Test coordination for project orders

IEC

IEC-referenced test documentation support

Records

Inspection photos and documents for buyer review

Routine Tests

Routine checks are selected according to product type and project requirements before packing and shipment.

  • Transformer checks such as winding resistance, ratio, insulation resistance and power-frequency withstand where applicable.
  • Switchgear checks for mechanical operation, wiring, interlock, insulation and protection configuration.
  • Nameplate, accessories, packing list and document consistency checks before release.

Type Tests & IEC Compliance

Type test reports and IEC-referenced documentation can support buyer qualification, tender review and project approval.

  • IEC 60076 reference for power transformer procurement and technical review.
  • IEC 62271 reference for medium voltage switchgear and ring main unit projects.
  • IEC 61439 reference for low voltage switchgear assemblies where requested.

Factory Acceptance Test

FAT can be coordinated around agreed inspection items, document review, photo evidence and remote buyer confirmation.

  • Pre-FAT technical checklist aligned with the purchase order and drawings.
  • Remote FAT support through photos, videos and document packs when site visit is not practical.
  • Final release only after agreed inspection records and packing requirements are confirmed.

Operational Path

Testing and FAT Workflow

The same workflow is used for transformer, switchgear and substation orders: engineering confirmation, controlled production, documented inspection, export packing and shipment coordination.

  1. Step 1

    Confirm applicable product standards, purchase specification and inspection checklist.

  2. Step 2

    Prepare routine inspection records, wiring checks, accessories and document package.

  3. Step 3

    Coordinate FAT review through on-site or remote evidence according to buyer requirement.

  4. Step 4

    Close punch items, update records and release the equipment for export packing.

Testing area for electrical equipment
Routine testing area for factory inspection before shipment.
Switchgear control and inspection room
Switchgear inspection and control wiring verification.
Transformer production line prepared for inspection
Transformer production line with inspection checkpoints before packing.

Send drawings, standards or project specs for review.

ZY POWER can review load schedules, single-line diagrams, voltage levels, protection requirements and export documentation before quotation.