Trust Center

Factory Capability

ZY POWER manufactures power transformers, prefabricated substations, medium voltage switchgear, low voltage switchgear and related distribution equipment with export-focused engineering review, workshop control and documentation support.

Transformer assembly line inside ZY POWER manufacturing workshop
Transformer and power distribution equipment manufacturing workshop in Zhejiang, China.

Transformer

Dry type, oil immersed and distribution transformer assembly

Switchgear

MV and LV panel assembly with project-specific layouts

Substation

Prefabricated compact substation integration

Export

Packing, documentation and shipment coordination support

Workshops

Production is organized around transformer assembly, switchgear panel assembly, enclosure integration and final inspection areas.

  • Dry type and oil immersed transformer assembly areas for distribution projects.
  • MV and LV switchgear panel assembly for utility, industrial and renewable energy projects.
  • Box substation integration for transformer, RMU, LV cabinet and enclosure coordination.

Production Process

Project orders move from technical confirmation to material preparation, assembly, wiring, inspection, packing and shipping coordination.

  • Engineering review for voltage, capacity, protection, enclosure and installation requirements.
  • Production control for core equipment, accessories, wiring and nameplate consistency.
  • Final checklist before packing to reduce site installation and commissioning risk.

Manufacturing Capability

The factory supports customized procurement for transformer rooms, industrial parks, mining sites, solar farms and utility distribution networks.

  • Project-specific configurations for voltage class, capacity, protection level and installation environment.
  • Support for IEC and GB standards with test documentation requested for export projects.
  • Production photo, packing photo and shipment document support for international buyers.

Operational Path

Factory Order Workflow

The same workflow is used for transformer, switchgear and substation orders: engineering confirmation, controlled production, documented inspection, export packing and shipment coordination.

  1. Step 1

    Confirm drawings, load schedule, voltage level, capacity, enclosure and installation environment.

  2. Step 2

    Prepare materials, components, accessories and manufacturing instructions for the confirmed design.

  3. Step 3

    Complete assembly, wiring, mechanical checks and quality inspection before packing.

  4. Step 4

    Provide photos, packing list, nameplate details and shipment coordination for export delivery.

Electrical equipment assembly workshop
Assembly workshop for project-configured electrical equipment.
Transformer workshop with distribution transformer production
Transformer workshop for distribution and industrial applications.
Switchgear assembly room with electrical cabinets
Switchgear assembly and panel integration area.

Send drawings, standards or project specs for review.

ZY POWER can review load schedules, single-line diagrams, voltage levels, protection requirements and export documentation before quotation.